摘要
针对新建3万m3转炉气柜的换气过程,利用转炉煤气直接置换。论述了用柜高不变法换气时的气源选择、流量控制、换气时间及模拟试验等有关技术问题。
Based on gas replacement procedure of newly built 30 000 m3 gas- holder for converter, converter gas is directly replaced. The method of unchanged height of gas-holder is used when gas is replaced. Selection of gas source, flow con- trol, gas replacement time and simulation tests are presented when the method is used.
出处
《冶金动力》
1999年第4期33-35,44,共4页
Metallurgical Power