期刊文献+

HSPA+部署时Pre-R7终端的QoS问题研究

Research on Pre-R7 UE's QoS Issue When HSPA+ is Deployed
下载PDF
导出
摘要 针对Pre-R7终端不支持大于16 Mbit/s的速率从而导致HSPA+部署时PDP激活失败的问题,基于对UMTS QoS的协商机制的分析,考虑从不同网络节点限制QoS,给出了各种解决方案,并对各方案对现有标准和运营商网络的影响进行了详细的比较分析,同时给出了一种过渡方案,最后给出了选择建议。 If HSPA+ is deployed, PDP context activation procedure probably fails because Pre-R7 terminal does not support a rate higher than 16 Mbit/s. Aimed to this issue, based on the UMTS QoS negotiation mechanism and taking QoS restriction by different network nodes into account,variety of solutions and a temporary are proposed,and the impacts on current standard and operator's network are evaluated in detail. At last,some advices on selection of solutions are given.
出处 《邮电设计技术》 2011年第1期49-52,共4页 Designing Techniques of Posts and Telecommunications
关键词 高速分组接入增强 Pre—R7终端 QoS协商 自动设备检测 策略和计费控制 HSPA+, Pre-RU E, QoS negotiation ,ADD, PCC
  • 相关文献

参考文献4

  • 1Qualcomm Incorporated. R7 QoS subscription data for Pre-R7 UE [C ]. 3GPP TSG SA WG2 Meeting #78, San Francisco, 2010.
  • 23GPP TS 23.060 V7.9.0 Technical Specification Group Services and System Aspects;General Packet Radio Service (GPRS);Service de- scription ; Stage 2 [ S/OL ]. [ 2010-11-25]. http://www.quintillion.eo.jp/ 3 GPP/Specs/23060-790.pdf.
  • 33GPP TS 23.203 V7.c.0 Technical Specification Group Services and System Aspects ; Policy and charging control architecture [ S/OL ]. [ 2010 -11-25 ]. http://www.quintillion.co.jp/3GPP/Specs/23203-7b0.pdf.
  • 43GPP TS 25.413 V7.a.0 Technical Specification Group Radio Access Network;UTRAN Iu interface RANAP signalling [S/OL]. [2010-11- 25]. http://www.ttc.or.jp/imt/std/jp25413r99.pdf.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部