期刊文献+

安庆铜矿不规则二步骤矿柱采场回采实践 被引量:8

Practice of irregular jamb exploitation in Anqing copper mine
下载PDF
导出
摘要 本文针对安庆铜矿两侧矿房回采后矿体形态极不规整的"二步骤"矿柱采场,提出了小孔径VCR法掏槽及扇形中深孔侧向崩矿的回采方案,克服了传统钻凿切割天井掏槽采切比高、劳动强度大、安全性差等缺点,为矿山持续高产、稳产提供了技术保证。不仅取得了显著的经济效益,而且对类似矿山相似采场的回采有良好的参考作用。 This paper focuses on the form of ore body and irregular "two steps" of the pillar stope after the exploitation of the two sides of Anqing Copper Mine Deposit stope mining, proposing the solutions of Medium-length Ring Blasting Subdrifting and small aperture "VCR" method, for overcoming the high ratio of traditional drilling cutting mining, low efficiency, labor intensity, poor safety and so on. Besides, the solutions brought the benefits of increasing the high and stable production, ensuring the technical skills, and achieving significant economic effectiveness. Moreover, the methods can also provide a reference for other related coal mining.
出处 《中国矿业》 北大核心 2011年第2期78-80,87,共4页 China Mining Magazine
关键词 安庆铜矿 矿柱回采 小孔径“VCR法”掏槽 中深孔 Anqing copper mine Jamb exploitation slotting by "VCR" moderate-longhole mining method
  • 相关文献

参考文献8

二级参考文献14

共引文献56

同被引文献57

引证文献8

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部