期刊文献+

天东90井电潜泵排水实施效果评价 被引量:1

EVALUATION OF ESP DRAINAGE EFFECT IN TIANDONG 90 WELL
下载PDF
导出
摘要 通过对比分析电潜泵排水工艺实施前后天东90井排水幅度、井底流压下降速度及邻井水气比变化情况,评价了天东90井电潜泵排水实施效果。天东90井实施电潜泵排水后,排水量最高达到450m3/d,高于正举,反举,略高于增压正举排水,与增压反举措施排水量相当。同时,井底流压下降速度高于周边气井,说明实施电潜泵排水措施初见成效。 By comparatively analyzing the changes in Tiandong 90 well, such as in drainage range, descending speed of bottom hole flowing pressure, and water-gas ratio, before and after implementation of ESP drainage technology, the drainage effect is ealuated. After ESP drainage, the maximum water discharge is up to 450m3/d, which is higher than that of the drainage with air flowin annular space or central tube, slightly higher than that of pressurized drainage with air flow in annular space, and equal to that ofpressurized drainage with air flow in central tube. Meanwhile, the descending speed of flowing pressure at the edge of well is higherthan that of surrounding wells, which shows that the ESP drainage has achieved initial success.
出处 《天然气勘探与开发》 2011年第1期42-43,46,共3页 Natural Gas Exploration and Development
关键词 天东90井 电潜泵 排水 水气比 压降速度 Tiandong 90 well, ESP, drainage, water-gas ratio, descending speed of pressure
  • 相关文献

参考文献2

共引文献11

同被引文献9

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部