摘要
介绍西北铅锌冶炼厂扩产12万t锌,配套的供电系统需要增容改造,在分析了旧供电系统的基础上,提出了科学合理的增容改造措施。解决了在增容中遇到的实际问题,避免了供电系统的盲目扩大,设备选型力争先进、节能,兼顾了投运后的维护成本,整个方案节约了大量投资。
This paper briefs the extension of power supply system to meet the requirement of 120 000 t zinc smelting capacity increase for northwest lead and zinc smelter.It outlines technical measurement to take for the extension,which will solve obstacles in the project and avoid unnecessary over-investment.The solution proposed by this paper has type selection on equipment with consideration of advance technology,energy saving,and minimum operation and maintenance cost.The whole solution will save a large amount of investment.
出处
《甘肃冶金》
2011年第1期48-50,共3页
Gansu Metallurgy
关键词
铅锌冶炼
扩产
电力增容
lead zinc smelting
extension
power capacity increase