摘要 为了进行深水水下管汇主结构设计和计算,考虑了结构从设计到服役过程中的不同工况,对结构受力进行了分析,得到了结构不同工况下所承受的载荷。在此基础上,应用SACS软件进行了计算,通过计算结果可以看出文中所设计的管汇主结构是安全、可靠、且满足工作条件的,为深水水下管汇结构提供了合理的设计、计算方法。 For the main structural design and calculation of deep water subsea manifold, the different work conditions from design to service are considered, and the forces effect on the system are analyzed and gained. Based on the analyses the calculations are made by SACS, from result of the calculations, it can be seen that the main structure of the subsea manifold in the paper is safe, reliable and satisfy the work conditions, a reasonable design and calculate method is provide for the design of deep water subsea manifold.
出处 《机械工程师》 2011年第2期134-135,共2页 Mechanical Engineer
关键词 结构力学 水下管汇 吊装 拖航 在位 structural mechanics subsea manifold lifting towing in-place
  • 相关文献

参考文献4

  • 1GREGORY N, et al. Subsea Production System: An Overview [C]//OTC,30 April-3May 2001, Houston, Texas: 1-21.
  • 2ROBINSON R, et al Design Challenges of a 48-inch Pipeline Subsea Manifold [C]//OTC 5 May-8 May 2003, Houston, Texas : 1-7.
  • 3BARNAY G. The Subsea Production System Presentation and Challenges[C]//OTC 6 May-9 May 2002, Houston, Texas: 1-8.
  • 4Falttinsen O M.船舶与海洋工程环境载荷[M].杨建民,等译.上海:上海交通大学出版社,2008:169-172.

同被引文献60

  • 1汪建平,罗晓明,景勇.系泊浮筒海上安装方法之探讨[J].资源节约与环保,2012,27(5):152-155. 被引量:2
  • 2关小虎,张晓军,薛小强,熊智.橇装井口管汇装置的优化设计[J].石油矿场机械,2004,33(4):41-43. 被引量:6
  • 3陈家庆.海洋油气开发中的水下生产系统(一)[J].石油机械,2007,35(5):54-58. 被引量:53
  • 4Lafitte J I., Perrot M, Lesgent J, et al. Dalia Subsea Production System: Presentation and Challenges [C]. OTC 18541,2007.
  • 5ISO13628 1. Petroleum and natural gas industries- Design and operation of subsea production systems [s].2010.
  • 6Eric J, Parker, Chiara Maria Traverso, et al. Vulnera bility of Subsea Structures to Geohazards Some Risk Implications[C]. OTC 20090,2009.
  • 7Speirs A P, Reichard R H, Lyle C R, et al. Execution of EPC Submarine Pipeline Projects in the Cantarell Field[C]. OTC 10861,1999.
  • 8DNV RP D101. Structural Analysis of Piping Systems [s] 2008.
  • 9Roy Robinson, Kenny J P, Jerry Grass. Design Chal lenges of a 48 inch Pipeline Subsea Manifold[C]. OTC15275,2003.
  • 10Farrokhzad M A. Cost Reducing Factors in Effective Pipeline Piling Structure Design and Construction in Alberta's Thermal SAGD Gathering Pipeline Systems [G]. SPE/PS/CHOA 117845,2008.

引证文献8

二级引证文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部