摘要 针对高原寒冷缺氧等复杂恶劣气候,为确保设备动力,对既有铺架设备进行改造。在柴木铁路江仓曲大桥T梁架设过程中,对施工组织等方面进行了周密部署,从而取得了高原地区日架梁14孔的效果,为高原地区铺架施工积累了宝贵经验。 Aiming at the complicated harsh climate such as chillness and oxygen deficit in the highland,to ensure the equipment power,a transformation was carried out in the existing laying and erecting equipment.During the T-shape beam erection process in Jiangcangqu Grand Bridge of Chaimu Railway,a thorough disposition was made for construction organization,achieving the good effect of erecting 14 beams in the highland every day,which provides valuable experience for laying and erecting construction in the highland.
出处 《铁道建筑技术》 2011年第1期81-84,共4页 Railway Construction Technology
关键词 高原铁路 架桥机 T梁架设 highland railway bridge erection machine T-shape beam erection
  • 相关文献

参考文献2

  • 1TB10213-99.铁路架桥机架梁规程[S].[S].,..
  • 2TB10302-96铁路轨道施工规范[S].

共引文献13

同被引文献11

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部