以嘉兴电厂二期(4×600MW)的烟气脱硫技改工程为例,在脱硫负荷和厂用电负荷的计算基础上对高压引接电源方案进行了分析,提出了值得思考和商榷的问题,最后从建设业主的角度总结了在工程实施中的难点及注意事项。
By taking the flue gas desulfurization of Jiaxing power plant phase II project(4×600 MW) as an example,this paper analyzes the high-voltage power supply schemes based on the estimation of desulfrization load and auxiliary power load.Some issues that are worth thinking and discussion are proposed and finally the difficulties occurring in engineering construction and points for attention are summarized in the view of project owners.
出处
《电力建设》
2011年第1期80-82,共3页
Electric Power Construction