南京梅山电厂EPC总承包项目管理实践 被引量:3

Management Practice of EPC Project in Nanjing Meishan Power Plant
原文传递
导出
摘要 火电厂是资金密集型和技术密集型企业,火电工程建设要求高,难度大。火电工程实行工程总承包,可以充分发挥总承包企业的设计、采购、施工等的协同管理优势,最大限度满足业主的需求。文章结合梅山电厂EPC(Engineering,Procurement,Construction)项目管理实践,分析了火电工程总承包的项目管理策略,阐述了总承包项目管理的重点和主要管理内容,为提高项目管理水平和总承包商的市场竞争能力提供参考。 Coal-fired power plants are resource-intensive and technology-intensive enterprises.Construction of a coal-fired power project involves high requirements and difficulties.For general contracting of such projects,the general contractor can bring into full play of the advantages of coordinated management of engineering,procurement,and construction,and satisfy the owner's demands to the maximum extent.Based on the management practice of Meishan Power Plant EPC(Engineering,Procurement,Construction) Project,this paper analyzes the project management strategy for general contracting of coal-fired power plants,and describes the key management points and main contents for general contracting project,thereby providing a reference for improvement of project management level and the market competitiveness of the general contractor.
作者 李剑锋
出处 《电力建设》 2011年第1期108-112,共5页 Electric Power Construction
关键词 火电工程 电厂 工程总承包 EPC(Engineering Procurement Construction) 项目管理 管理实践 fossil-fired power project power plant general contract of project EPC(Engineering Procurement Construction) project management management practice
  • 相关文献

参考文献7

二级参考文献21

共引文献66

同被引文献9

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部