摘要
通过东莞市人民北立交雨水泵站设计实例分析,对汇水面积计算、重现期选择、集水时间、收水形式、泵站形式、工艺设计等几个关键技术难点进行了阐述,并指出了立交排水管线设计应重点考虑的几个方面,以确保雨水顺利进入泵站。
According to the analysis of the design examples for the people's rainwater pump station by overpass in Dongguan,the paper illustrates some key technical points,including the calculation of collecting water areas,the selection of the recurrence interval,the time of collecting water,the forms of water collection,the forms of pump station,and the craft design and so on,and points out some aspects which should be considered for the drainage pipeline design of the overpass,so as to ensure the rainwater to enter the pump station smoothly.
出处
《山西建筑》
2011年第8期213-215,共3页
Shanxi Architecture
关键词
立交排水
汇水面积
雨水泵站
设计
overpass drainage
area of water collection
rainwater pump station
design