摘要
金安桥水电站导流明渠围堰由于地质条件及导流洞不具备过渣条件,所以采用聚渣坑的处理方案,本文通过对金安桥水电站导流明渠进口围堰拆除施工技术的总结,旨在对今后类似工程起到借鉴作用。
Jin'anqiao hydropower station diversion channel cofferdam,due to its geological conditions and the diversion tunnel without the residue filting condition,therefore,the polyethylene slag pit treatment option is adopted.The paper summarized the Jin'anqiao hydropower diversion channel cofferdam dismantle construction technology which aims to provide reference for future's similar projects.
出处
《价值工程》
2011年第6期61-62,共2页
Value Engineering
关键词
岩埂
开挖
造孔
施工道路
聚渣坑
leading flow tunnel
digging
hole making
construction road
slag accretion pit