摘要 从环境地质角度,对水口库区的塌岸问题,即库岸再造现象进行监测研究,并对塌岸发展的最终宽度、稳定时间历程进行预测,为水电工程移民安置。 Formerly,much more attention has been paid to the dam site than the reservoir area in geological study of hydroelectric project. The paper analysed and forecasted the monitoring results of reservoir bank collapse of Fujian Shuikou hydroelectric station, according to the environmental geological conditions, and also, calculated the developing greatest width and the time duration. It is used for reference of the migration and reservoir area construction. For reservoir bank collapse, whether analysis of the present erosional width, amount and velocity, or forecast of the developing greatest width and the time duration. make known its evolution and endangering degrees, on the reservoir area construction, slope stability and reservoir siltation. The towns and villages around the reservoir, farmland and orchard, ecnomic woodland and soil slope programed, should proceed to the reservoir bank protection in a planned way, for serving sustainable developing.
作者 林军
出处 《山地学报》 CSCD 1999年第4期343-348,共6页 Mountain Research
基金 国土资源部与福建省政府共同资助
关键词 水库 塌岸 福建 水口水电站 库区 Reservoir bank collapse,monitor and forecast,Fujian Shuikou
  • 相关文献

参考文献3

  • 1张倬元,工程地质分析原理,1994年,552页
  • 2欧正东,环境地质学的理论与应用研究,1994年,1页
  • 3胡广韬,工程地质学,1984年,291页

同被引文献27

引证文献2

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部