重点阐述了李家峡水电站3^#机组下机架与推力轴承安装过程,以及为达到设计要求,对变形控制所采取的工艺措施。
The process of installing the mounting rack beneath No.3 unit and thrust bearing of Lijiaxia Hydropower Station is introduced, and the measures to control the process in order to achieve the design standard is also mentioned.