摘要
采用位移和稳定性的双控制原则,结合实际工程介绍人工挖孔护坡排桩在加固高压输电塔架基础的设计方法,并得到满意的结果。
Based on the control of displacement and stability, a design metha of hand dug bracing pile by means ofa case record of strengthening the foundation of bossion power tower is introduced . The sedening result showsthat the mehe is effective and satisfactory.
出处
《福建建筑》
1999年第4期43-44,共2页
Fujian Architecture & Construction