摘要
本文对福州市三县洲大桥斜拉桥的塔、梁、墩团结体系的关键部位──中横梁施工方法进行了介绍、分析和总结,得到若干有价值的结论。
The anchon method of transverse bearn sited on the mein ber of Sanxianzhou cable - stayed bridge, inwhich main tower , transverse bearn, and pier were fixed, were ieduced, analrred and summarized in this paper. Sever-al vausble arelusbo were obtained.
出处
《福建建筑》
1999年第4期45-47,共3页
Fujian Architecture & Construction
关键词
斜拉桥
中横梁
施工方法
Cable-stayed Bridge, Transverse Beam, Construction Methods