摘要
钢坝闸景观效果明显、安全可靠、操作运行方便快捷但造价较高,橡胶坝经济实用、抗震性能好但景观效果不够理想。文章分析比较二者工作原理及特点,结合临沂市陷泥河综合治理工程实例,根据河道具体情况对两方案进行对比,为读者对河道治理中拦河闸坝的选择提供参考。
The steel dam gate is great in appearance, safe and reliable, easy and fast in operation, but high in cost. The rubber dam is economic and practical, with a good seismic performance, but the appearance is inadequate. This paper analyzes and compares the working principles and features of the two dams, and based on the comprehensive harnessing of the Xianni River in Linyi City and the details of the fiver channel, the two alternatives are compared, which provides references for selection of gate barrages in river harnessing.
出处
《西北水电》
2011年第1期27-29,共3页
Northwest Hydropower
关键词
钢坝闸
橡胶坝
河道治理
底横轴翻转闸门
挡水建筑物
steel dam gate
rubber dam
fiver harnessing
flap gate with bottom horizontal axis, water retaining structure