高桩梁板码头晃动原因分析及处理对策 被引量:1

Sloshing reasons and treatment measures of beam-slab piled wharf
下载PDF
导出
摘要 某高桩梁板码头在运营过程中出现明显的晃动现象。采用三维有限元数值动力分析方法,取码头的1/2排架系统计算结构的自振频率,采用m法模拟桩周土对桩的约束作用,用ANSYS程序进行计算分析不同处理措施下码头第一振动频率的提高值。计算分析表明:采取抛石固桩、桩内灌注混凝土和增设钢撑后,码头第一振动频率提高10%~84%,能有效解决码头晃动问题。 A beam-slab piled wharf appeared sloshing in the process of operation.Using three-dimensional finite element analysis,we computed the natural frequency of a half of the wharf bent system,simulated the restraint function of soil effecting piles by m method,and analyzed the wharf's first vibration frequency about different treatment measures by ANSYS software.The calculating and analyzing results show that through rubble filling,concrete pouring into the pile,and welding of steel pipe on the wharf bent,the first vibration frequency of wharf raises 10%~84%,and thus the problem of sloshing can be solved effectively.
出处 《水运工程》 北大核心 2011年第2期58-62,共5页 Port & Waterway Engineering
关键词 高桩码头 排架 斜桩 晃动 振动响应 自振频率 piled wharf bent inclined pile sloshing vibration response natural frequency
  • 相关文献

参考文献4

  • 1邱驹.港口水工建筑物[M].天津:天津大学出版社,2002.
  • 2刘坤.ANSYS 有限元法精解[M].北京:国防工业出版社,2004.
  • 3JTJ 291-1998 港口工程设计与施工规范[S].
  • 4JTJ 254-1998,港口工程桩基规范[S].