介绍了康家湾矿副井提升系统为满足矿山二期改扩建需要,进行技术改造的特点、难点及所采取的措施。
The feature,difficulty and taken measures in technical modification for auxiliary shaft hoisting system in kangjiawan mine to meet the requirement of mine phase Ⅱ reconstruction and expansion were introduced in this paper.
出处
《冶金矿山设计与建设》
1999年第5期23-25,29,共4页
Metal Mine Design & Construction
关键词
副井
提升系统
技术改造
罐笼
矿车
Auxiliary shaft Hoisting system Technical modification Cage Mine truck