1Osterberg Jori.New device for load testing driven piles anddrilled shaft separates friction and end bearing[J].Piling and Deep Foundations,1989(1):421-427.
3[1]Jori Osterberg. New device for load testing driven piles and drilledshaft separates friction and end beating. Piling and Deep Foundations, 1989.421~427
4[3]Ulrich Vollenweder. Prufung nach dem pfahfusspresserfahren.Zurich: Journey of ETH,1997
7Osterberg J O, Hayes J A. The Osterberg Load Cell as a Research Tool[A]. the XVth International Conference on Soil Mechanics and Geotechnical Engineering[C], Istanbul, Turkey, 2001.
8JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
9Bruce D A. Enhancing the performance of large diameter piles bygrouting[J]. Grouting Engineering, 1985, (4): 9-15
10Bruce D A. Enhancing the performance of large diameter piles bygrouting[J]. Grouting Engineering, 1985, (5): 11 -19