通过对某铀矿冶工程336矿床开拓方案设计的分析,并经过技术经济论证,发现开拓370 m中段作为336矿井的出渣平硐不合理。提出取消370 m出渣平硐,并将330 m出矿平硐改为出矿、出渣综合运输平硐的优化措施,达到了节省投资、减少运营费用、降低成本的目的。
Through the analyses of No. 336 deposit exploitation design of a uranium mining and metallurgy project and the technical and economic feasibility, it is found that exploiting 370 m level as muck removal adit of No. 336 mine is unreasonable. It is put forward that 370 m muck removal adit should be cancelled and 330 m ore removal adit should be changed to integrated transporting adit. The optimized measures can achieve the purposes of saving investment, reducing operation expenses and lowering cost.