优化某铀矿冶工程336矿床开拓方案设计

Optimization of No.336 deposit exploitation scheme of a uranium mining and metallurgy project
下载PDF
导出
摘要 通过对某铀矿冶工程336矿床开拓方案设计的分析,并经过技术经济论证,发现开拓370 m中段作为336矿井的出渣平硐不合理。提出取消370 m出渣平硐,并将330 m出矿平硐改为出矿、出渣综合运输平硐的优化措施,达到了节省投资、减少运营费用、降低成本的目的。 Through the analyses of No. 336 deposit exploitation design of a uranium mining and metallurgy project and the technical and economic feasibility, it is found that exploiting 370 m level as muck removal adit of No. 336 mine is unreasonable. It is put forward that 370 m muck removal adit should be cancelled and 330 m ore removal adit should be changed to integrated transporting adit. The optimized measures can achieve the purposes of saving investment, reducing operation expenses and lowering cost.
作者 李振宗
出处 《铀矿冶》 CAS 2011年第1期6-8,共3页 Uranium Mining and Metallurgy
关键词 铀矿床 开拓方案 设计优化 改进 uranium deposit exploiting plan design optimization improvement