控压钻井井筒压力控制技术初探 被引量:11

An approach to annular pressure control by managed pressure drilling
下载PDF
导出
摘要 常规钻井技术钻遇压力衰竭或复杂地层时,经常遇到钻井液安全密度窗口窄,并引起漏、喷、卡、塌等井下复杂问题。控压钻井(MPD)通过控制井筒环空循环流体介质的流量与流态、井口施加压力等因素,结合环空压降模型计算,使环空压力保持在一定的范围,就可以降低甚至避免这些钻井问题,减少非钻井作业时间,提高钻井效率,降低作业成本。 Narrow operation window is quite common in conventional drilling while encountering pressure depletion or complex formation,leading to downhole problems such as leaking,sticking,blowout,and hole collapse,etc.Managed pressure drilling(MPD) can mitigate or even avert these drilling problems by manipulating annular pressure through controlling the flow rate and regime of annulus circulating media and the pressure applied at wellhead in conjunction with model calculation of annular pressure drop.This technology can reduce non-production time,enhance drilling efficiency,and reduce operation cost.
出处 《特种油气藏》 CAS CSCD 2011年第1期132-134,142,共3页 Special Oil & Gas Reservoirs
基金 国家高技术研究发展计划("863"计划)资助(2006AA06A104)
关键词 控压钻井 压降 排量 地层压力 回压 managed pressure drilling pressure drop flow rate formation pressure back pressure
  • 相关文献

参考文献9

  • 1王延民,孟英峰,李皋,李玉飞,陈勇.超深井气体钻井环空流动研究[J].钻采工艺,2008,31(5):10-12. 被引量:4
  • 2Vieira P,Amone M,Russel B,et al.Constant bottom hole pressure:Managed-pressure drilling technique applied in an exploratory well in saudi arabia[C].IADC/SPE 113679,2008:1-14.
  • 3Johnson Chydi Njoku,Alex Husser,Robert Clyde.New generation rotary steerable system and pressure while drilling tool extends the benetifits of managed pressured drilling in the gaulf of mexico[C].IADC/SPE113491,2008:1-11.
  • 4Olve S,Sisbjon S.Evaluation of MPD methods for compensation of surge-and-swab pressure in floating drilling operations[C].sPE/IADC108346,2007:1-11.
  • 5Don M Hannegan,P E.Managed pressure drilling in marine environments-case studies[C].SPE/IADC92600,2005:1-5.
  • 6Hannegan D,Fisher K.Managed pressure drilling in marine environments[C].IPTC 10173,2005:1-9.
  • 7Don Hannegan,Richard J,DavidM,et al.MPD-Uniquely applicable to methane hydrate drilling[C].SPE/IADC91560,2004:1-4.
  • 8Antonio C V M Lase,Petrobras,Rune W Time.An experimental and theoretical investigation of upward two-phase flow in Annuli[C].SPE64525,2000:1-14.
  • 9Pérez-Téllez C,Smith J R,Edwards J K.A new comprehensive,mechanistic model for underbalanced drilling improves wellbore pressure predictions[C].SPE 74426,2002 11-13.

二级参考文献6

共引文献3

同被引文献94

引证文献11

二级引证文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部