盾构施工中端头井加固技术 被引量:1

The Consolidating Technology for the End Shafts of the Tunnel in the Shield-Tunneling Construction
下载PDF
导出
摘要 在盾构机出洞或进洞前要对端头井区域内数米范围内的土体进行加固改良以满足对土体的强度要求。针对上海轨道交通线区间隧道淤泥质黏土层及粉质砂土的地质状况,介绍了主要采用的三轴搅拌桩搅拌加固及三重管高压旋喷加固施工技术。加固效果满足盾构进出洞要求。 To meet the requirements of the soil body in strength,the soil bodies within several metres of the tunnel at both the inlet end and the outlet end have to be consolidated before the shield tunneling really begins.With the specific geological conditions of silting clay stratum and powdered sandy soil taken into account,the consolidating techniques of tri-axle mixture piles and tri-tube high-pressure rotatively-casting are adopted for the construction and are dealt with in the paper.It is proved that the effect of the consolidation can meet the strength requirements of the tunnel for its inlet and outlet sections.
作者 张瑞芬
出处 《国防交通工程与技术》 2011年第1期60-62,共3页 Traffic Engineering and Technology for National Defence
关键词 盾构法 端头井加固 搅拌桩 高压旋喷 shield tunneling method consolidating of the end section of the tunnel mixture pile high-pressure rotatively-cast pile
  • 相关文献

参考文献5

二级参考文献9

共引文献15

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部