辽河油田双底鱼骨井设计与实施 被引量:4

DESIGN AND IMPLEMENTATION OF TWO-BOTTOM HERRINGBONE WELL IN LIAOHE OILFIELD
下载PDF
导出
摘要 与常规直井和水平井相比,鱼骨井因其泄油面积大、相同液量下压差小、能更加经济有效地开发复杂结构油气藏而在辽河油田获得成功应用。基于数值模拟技术和鱼骨井产能评价模型,对双底鱼骨井进行了井身结构设计,确定第一分支主井眼裸眼段长963 m,鱼刺分支共6个;第二分支主井眼裸眼段长735 m,鱼刺分支共5个。从施工难点、钻完井工艺技术、钻井液技术等3个方面介绍了该井现场实施的过程。该井油层钻遇率达到100%,初期日产油62 t,是同一区块水平井产量的3倍、直井产量的10倍,取得了显著的开发效果。该井的成功设计与实施为我国复杂结构井技术的发展积累了宝贵经验。 Compared with vertical wells and horizontal wells,herringbone well has larger drainable section and smaller production pressure,therefore,herringbone well has been successfully applied in the development of faulted block reservoirs in Liaohe Oilfield.The two-bottom herringbone well configuration design is based on the numerical simulation and the productivity evaluation model for herringbone well.The length of the 1st interval main hole is 963 meters,and the 1st lateral has six branches.The length of the 2nd interval main hole is 735 meters,and the 2nd lateral has five branches.Introduce the implementation in three aspects:difficulties in the implement,drilling completion technique and drilling fluid technique.The two-bottom herringbone well is successfully fulfilled with 100% oil layer penetration,and its initial production is 62 ton,which is three times of the horizontal well′s production and ten times of the vertical well′s production in the same block.The perfect economic and social benefits are gained.The two-bottom herringbone well provides welcome experience for the application of composite wells in China.
出处 《西南石油大学学报(自然科学版)》 CAS CSCD 北大核心 2011年第1期135-138,19-20,共4页 Journal of Southwest Petroleum University(Science & Technology Edition)
关键词 辽河油田 双底鱼骨井 井身结构设计 施工难点 钻完井技术 钻井液技术 Liaohe Oilfield two-bottom herringbone well well configuration design difficulties in the implementation drilling completion technique drilling fluid technique
  • 相关文献

参考文献11

二级参考文献24

共引文献100

同被引文献36

  • 1刘永辉,李祥银,白亮清,杨景中,汪浩源,白良杰.鱼骨型水平分支井技术[J].石油钻采工艺,2007,29(z1):16-20. 被引量:7
  • 2李臣,方志斌,刘春兰,冯学章,王坤,马汗.示踪剂在砂砾岩油藏开发中的应用[J].新疆石油地质,2005,26(1):99-101. 被引量:12
  • 3程林松,李春兰,郎兆新,张丽华.分支水平井产能的研究[J].石油学报,1995,16(2):49-55. 被引量:124
  • 4赵立新,蒋明虎,赵雪峰,刘书孟,吴柏志.复杂结构水平井产能关系研究[J].中国石油大学学报(自然科学版),2006,30(3):77-80. 被引量:6
  • 5JeffWuCF MichaelHamada.试验设计与分析及参数优化[M].北京:中国统计出版社,2003.1-32.
  • 6Giger F M,Resis L H,Jourdan A P. The reservoir en-gineering aspects of horizontal drilling[C]. SPE 13024,1984.
  • 7Giger F M. Horizontal wells production techniques in het-erogeneous reservoir[C]. SPE 13710,1985.
  • 8Joshi S D. Augmentation of well productivity withslantand horizontal welIs[C]. SPE 15375,1988.
  • 9Han Guoqing,Li Xiangfang,Wu Xiaodong. Experimen-tal research on multi-lateral wells by the electric field ana-logue model[J]. Petroleum Science,2004,(1):66-71.
  • 10Myers R H,Montgomery D C. Response surface method-ology:process and product optimization using designedexperiments[M]. New York:Wiley-Nescience publica-tion,2002,34-35.

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部