8CHEN C T, LIN C T, HUANG S F. A fuzzy approach for supplier evaluation and selection in supply chain management[J]. International Journal of Production Economics, 2006,102 (2) :289-301.
9肖德辉.可靠性工程[M].北京:宇航出版社,1995:369-481.
10DONG S, GU S. Decomposition heuristic to minimize total cost in a multi-level supply chain network[J]. Computer &Industrial Engineering,2003,54(4) :945-959.
5SAVi-YER J P. Fault Tree Analysis of Mechanical Systems[J]. Microelectron and 1Keliabiliw, 1994, 54(4): 653-667.
6Matthew Gorton,Mikhail Dumitrashko,John White.Overcoming supply chain failure in the agri-food sector. A case study from Moldova Food Policy[J]. European Journal of Operational,2006,31(1):90-103.
7Thomas Kull,David Closs.The risk of second-tier supplier failures in serial supply chains: Implieations tor order policies and distributor autonomy[J].European Journal of Operational Research, 2008,186(3): 1158-1174.
8Leee C ,Jong G S,Yoaagtae P.A .statical armlysis of ealghleefing prqieet risks in the Kolvan shiphlikiing industrt[J].Joumal of Strip Ptrldtlction, 2(137,23(4) : 223-330.
10Ying Kei Tse,Kim Hua Tan.Managing product quality risk in a muhi-tier global supply chain[J]. International Journal of Production Research, 2011,49(1) : 139-158.