摘要
结合深圳地铁5号线布吉中学站—布吉客运站区间隧道穿越广深铁路的工程实践,分析了地铁区间隧道下穿铁路时,盾构施工及铁路运营两者之间的相互影响,介绍了盾构机推进、区间隧道加固等方面的主要技术措施。
Combined with a project engineering,the interval tunnel(between Buji Middle School Station and Buji Passenger Terminal Station of Metro Line 5 in Shenzhen) crossing Guangshen Railway,the interplay between shield construction and railway operation is introduced when metro interval tunnel crossing under railway.Furthermore,main technology measures of the promoting of shield machine and interval tunnel strengthening,etc.are introduced.
出处
《中国市政工程》
2011年第1期43-45,84,共3页
China Municipal Engineering
关键词
地铁隧道
盾构下穿铁路
施工技术
metro tunnel
shield crossing under railway
construction technology