混凝土徐变模式对连续梁桥预拱度计算的影响 被引量:1

A Research of the Influence of Concrete Creep Mode on the Pre-camber Calculation of Continuous Beam Bridge
下载PDF
导出
摘要 混凝土徐变是混凝土连续梁桥预拱度计算的一项主要内容。从徐变模式出发,综合比较了国内1985年与2004年《公路钢筋混凝土及预应力混凝土桥涵设计规范》新旧桥规徐变模式的差异。以某高速公路上的1座大跨度连续梁桥为项目背景,建立有限元模型,对不同徐变模式下的预拱度计算结果进行对比,得到:1985年桥规徐变计算结果较2004年桥规大;预拱度的设置,宜遵循"宁高勿低"的原则。 Concrete creep is a main part of pre-camber calculation of concrete continuous beam bridge.Based on creep mode,the differences of Code for Designs of Highway Reinforced Concrete & Prestressed Concrete Bridges & Culverts in 1985 and in 2004 are compared comprehensively.Taking a large span continuous beam bridge on an expressway and building a related finite element model,the pre-camber calculation results under different creep modes are made a contrast,then,the conclusions show that 1) the creep calculation results by the code in 1985 are more than the results in 2004;2) the setting up of pre-camber should obtain the principle of 'better to be high than to be low'.
作者 杨燎原
出处 《中国市政工程》 2011年第1期78-79,87,共2页 China Municipal Engineering
关键词 混凝土徐变 连续梁桥 预拱度 徐变模式 concrete creep continuous beam bridge pre-camber creep mode
  • 相关文献

参考文献2

二级参考文献12

共引文献155

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部