轨道交通徐家汇换乘枢纽工程暖通设计难点分析 被引量:1

Difficulty analysis of HVAC system design of Xujiahui Underground Railway Center
下载PDF
导出
摘要 徐家汇枢纽是上海三条轨道交通线换乘枢纽,工程规模大,建设难度高,协调烦琐。从暖通资源共享方案、机房布置、风管设置、与建筑的协调、分期实施、火灾控制等方面介绍了该工程的暖通空调设计,可供今后类似设计参考。 This center is the junction station of three city railway lines,featuring in large scale,difficult design and cumbersome coordination between disciplines.Presents the HVAC design of the station from the aspects of the resource sharing plan,the equipment room arrangement,the air duct arrangement,the coordination with architectural style and building structure,the phased implementation,fire control,etc.,providing reference for HVAC design in similar underground railway station.
作者 黄丽君
出处 《暖通空调》 北大核心 2011年第2期38-40,28,共4页 Heating Ventilating & Air Conditioning
关键词 换乘枢纽 地下室改造 地铁车站 资源共享 underground railway station center reconstruction of basement underground railway station resource sharing
  • 相关文献

参考文献2

二级参考文献3

  • 1徐正良,马仕明,崔勤,王卓瑛,张中杰.上海市轨道交通徐家汇枢纽“环港汇”方案设计[J].城市轨道交通研究,2006,9(3):47-51. 被引量:10
  • 2上海市城市建设设计研究院.上海市轨道交通徐家汇枢纽站方案研究[R].2005.3.
  • 3上海市城市建设设计研究院,上海申通轨道交通研究咨询有限公司.上海市轨道交通徐家汇枢纽实施性方案研究专题报告[R].2005.7.

共引文献5

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部