摘要
本文以同为“八五”期间建设的乙烯装置的规模、技术路线和总投资几乎相同的A厂与B厂为例,说明建设乙烯装置的可行性这一严肃的问题。
In the article, it gives full description on the feasibility, a very serious subject of building up ethylene plant, taking plant A and plant B as examples, which are almost similar in capacity, technology and total investment and constructed in the same period of the 'eighth - five - year plan'.
出处
《石油化工设计》
CAS
1999年第2期12-13,共2页
Petrochemical Design
关键词
乙烯装置
投资建设
经验
Ethylene plant Plant A Plant B Connotation of construction Capital ratio