软件项目计划与监控方法研究 被引量:1

Software Project Schedule Estimation Based on Three Methods Integration
下载PDF
导出
摘要 结合一些实际项目的数据,重点研究了自顶向下估计方法中软件项目的规模、工作量及进度等关系到项目成败的关键因素的计划与监控。提出了用PERT法和类比法相结合来进行规模估计,根据规模估计的结果来估计工作量,并根据工作量分布来获得进度的一套切实可行的项目策划和执行方法。在研究过程中,既考虑了单个因素的计划与执行,又考虑了各要素间的内在联系,从过程管理的角度进行整体研究,从而形成了一个完整的计划与监控体系,对于同行具有借鉴意义。 According to some actual data of projects,this study puts the emphasis on the planning and monitoring such factors as software project size,effort and schedule that are crucial to the success of the project during top-down estimation;PERT method and analogy method are combined together to estimate the size,and then the specific schedule is made according to the phase effort distribution.By these activities,a set of practical and feasible planning method system is put forward.During the study,a holistic research is held in terms of process management considering both the planning and monitoring a single item and the intrinsic relationship of all items.With this,an integrated planning and monitoring system is ultimately formed.The outcome is instructive to the people devoted to the same industry.
作者 张俊光
出处 《科技管理研究》 北大核心 2011年第5期180-182,179,共4页 Science and Technology Management Research
基金 中央高校基本科研业务费专项资金资助项目(FRF-BR-09-014A) 教育部人文社科基金项目(10YJC630384)
关键词 自顶向下 规模 工作量 进度 计划 执行 top-down size effort schedule planning implementation
  • 相关文献

参考文献10

  • 1MARCEL KORTE.Confidence in Software Cost Estimation Results Based on MMRE and PRED[C].Proceedings of the 4th Intemational Workshop on Predictor Models in Software Engineering,2008:63-70.
  • 2ROGER S PRESSMAN.Software Engineenng,A Practitioner's Approach[M].Fifth Edition.McGraw-Hill Companies,Inc.
  • 3MASOOD A BADRI,AMR MORTAGY.Effective Analysi and Planning of R&D Stages:A Simulation Approach[J].Intemational Journal of Project Management,1997,15 (6):351-358.
  • 4R S CHANDA,P K BHATTACHARJEE.A Reliability Approach to Transmission Expansion Planning Using Fuzzy Fault-tree Model[J].Electne Power Systems Research,1998,45:101-108.
  • 5M ABDOMEROVIC,G BLAKEMORE.Project Process Interactions[J].Intemational Journal of Project Management,2002,20:315-323.
  • 6HARVEY MAYLOR.Assessing the Relationship between Practice Changes and Process Improvement in New Product Development[J].Omega,2001,29:85-96.
  • 7K VINAY KUMAR.Software Development Cost Eatimation Using Wavelet Neural Neiworks[J].Journal of Systems and Software,2008,73 (1):93.
  • 8美国项目管理学会(PMI).项目管理知识体系指南(2000中文版)[M].北京:北京现代卓越管理技术交流中心.
  • 9RUCHI SHUKLA.Eatimating Software Maintenance Effort:A Neural Network Approach[C].Proceedings of the 1st Conference on India Software Engineering Conference Table of Contents,2008:107-112.
  • 10NIKOLAOS MITTAS.Improving Analogy-based Software Cost Estimation by A Resampling Method[J].Information and Software Technology,2008,50 (3):221-230.

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部