金安桥水电站工程截流施工技术及特点 被引量:1

River Closure Construction and Characteristics of Jin'anqiao Hydropower Station
下载PDF
导出
摘要 金安桥工程利用1号导流洞单洞分流下进行大江截流,截流流量为829 m3/s,龙口最大落差4.72 m,最大流速达7.15 m/s,截流段河床地形、地质条件复杂。在截流模型试验各种工况的试验成果基础上,结合截流的现场地形条件、分流特点、截流填筑材料等方面的分析比较后确定了上、下游土石围堰一次断流、右岸2条导流洞全年导流和60 m宽戗堤右岸单向进占立堵的截流方案,顺利实现了大江截流。 The river closure for Jin'anqiao Project was conducted on the conditions of using one diversion tunnel for water discharge, and with the flow rate of 829 m^3/s, the maximum gap drop of 4.72 m and the maximum flow velocity of 7.15 m/s. Based on the model tests for river closure under different conditions and the analysis on field topography, diversion features and filling materials, the closure schemes with end-dumping closure by an 60 m-width dike from right bank, full fiver closed by upstream and downstream earth-rock cofferdams and water released by two diversion tunnels in fight bank are adopted.
作者 冯美升 胡玉
出处 《水力发电》 北大核心 2011年第1期49-51,70,共4页 Water Power
关键词 截流设计 截流施工 金安桥水电站 fiver closure design fiver closure construction Jin'anqiao Hydropower Station
  • 相关文献

参考文献4

  • 1水利水电工程施工组织设计手册[M].北京:中国水利水电出版社,1994.
  • 2DL/T 5114-2000.水电水利工程施工导流设计导则[S].
  • 3武汉大学.中国水电顾问集团昆明勘测设计院.金安桥施工截流模型(动床)试验研究报告[R].昆明:中国水电顾问集团昆明勘测设计院,2005.
  • 4武汉大学,中国水电顾问集团昆明勘测设计院,中国水利水电第四工程局.金安桥施工截流模型(动床)补充试验研究报告[R].昆明:中国水电顾问集团昆明勘测设计院,2005.