摘要
目前国内大型水轮发电机组定子基本采用现场叠装的方式,其中定位筋安装是定子叠装的重要工序,因此其质量控制显得尤为重要,根据安装经验和有关资料简要介绍了金安桥水电站定子定位筋的安装工艺、安装过程及质量控制要点。
For field laminated assembly of large-scale hydro turbine generator stator, the installation of position bars is a key process and its quality eontrol is partieularly important. The installation processes, procedures and key quality controls are introduced for the position bar installation of generator stator in Jin'anqiao Hydropower Station.
出处
《水力发电》
北大核心
2011年第1期83-85,共3页
Water Power
关键词
定位筋
安装工艺
质量控制
金安桥水电站
positioning bar
installation process
quality control
Jin'anqiao Hydropower Station