期刊文献+

中国混凝土面板堆石坝的发展 被引量:80

Development of Concrete Faced Rockfill Dam in China
下载PDF
导出
摘要 2010年是我国引进现代筑坝技术建设混凝土面板堆石坝的第25年。面板堆石坝经过了"引进消化、自主创新、突破发展"三个阶段。通过不断总结经验教训,我国在面板堆石坝设计、施工、科研、监测和特殊条件下建坝等方面取得了瞩目的成就,建立了较为完备的具有自身特色的技术标准体系和工业化体系,如今我国面板堆石坝数量多,最大坝高、工程规模和技术难度都处于世界前列。筑坝技术正在向更高更难方向发展。 The Year 2010 is the 25th year of constructing concrete faced rockfill dams in China. After experiencing three development stages of Introduction and Assimilation, Innovation in Our Own Hands and Breakthrough and Development, the noteworthy achievements are gained on CFRDs' design, construction, research and monitor and constructing CFRDs on specific natural conditions. The complete technical standard system and industrial system are also established for the development of CFRDs. The number, maximum height, engineering scale and technology of CFRD has leapt into the front ranks of the world. The construction technology of CFRD is marching to a higher level in China.
出处 《水力发电》 北大核心 2011年第2期18-23,共6页 Water Power
基金 中国水力发电工程学会混凝土面板堆石坝专业委员会科技课题
关键词 混凝土面板堆石坝 发展 阶段 成就 方向 concrete faced rockfill dam development stage achievement trend
  • 相关文献

参考文献8

  • 1马洪琪,曹克明.超高面板坝的关键技术问题[J].中国工程科学,2007,9(11):4-10. 被引量:42
  • 2杨泽艳,周建平.我国特高面板堆石坝的建设与技术展望[J].水力发电,2007,33(1):64-68. 被引量:32
  • 3曹克明,等编著.混凝土面板堆石坝[M].北京:中国水利水电出版社,2009.
  • 4王伯乐主编.中国当代土石坝工 程[M].北京:中国水利水电出版社.2004.
  • 5蒋国澄.混凝土面板堆石坝进展综述[J].面板堆石坝工程,2000,(4).
  • 6蒋国澄.混凝土面板堆石坝进展综述.面板堆石坝工程,2001,.
  • 7赵征凯.我国高面板堆石坝技术新进展.面板堆石坝工程,2003,.
  • 8赵征凯.我国高面板堆石坝技术新进展.面板堆石坝工程,2004,.

二级参考文献7

共引文献69

同被引文献439

引证文献80

二级引证文献450

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部