盖下坝水电站是位于重庆市云阳县的一座引水式水电站,装机容量132MW,安装3台单机容量44MW机组。文章对该水电站输水系统的工程地质条件、输水系统布置以及进水口、引水隧洞、调压井及压力管道的设计作了介绍。
The Gaixiaba Hydropower Station, located in Yunyang County of Chongqing, is a diversion-type hydropower station with installed capacity of 132 MW of three generating units. The geological conditions for the conveyance system, the layout of the system and the design of intake, diversion tunnel, surge shaft and penstock are introduced herein.
出处
《水力发电》
北大核心
2011年第2期65-66,69,共3页
Water Power
关键词
输水系统
设计
盖下坝水电站
conveyance system
design
Gaixiaba Hydropower Station