峡江水利枢纽电站取水防沙试验研究 被引量:2

Experiment Study on Water Diversion and Sediment Control of Xiajiang Hydraulic Complex Project
下载PDF
导出
摘要 为解决峡江水利枢纽泥沙淤塞库区,避免泥沙进入电站,对取水防沙原设计方案试验中存在的问题进行了分析。改进了拦沙坎的布置方案,提出拦沙坎头部上延与上游自然河湾平顺衔接,以使形成的人工弯道环流导流排沙方案为最优取水防沙方案。探讨了优化方案的取水防沙效果,提出了运行时应注意的事项。 For avoiding sediment silting up reservoir and flowing through power plant, the original experiment on water diversion and sediment control for Xiajiang Hydraulic Complex Project is analyzed and the arrangement of silt attester is proposed to improve. The head of the silt arrester is extended to upstream and smoothly converged with the nature bay of river. The operation effects of the improved water diversion and sediment control are studied and the proposals on operation are also presented herein.
出处 《水力发电》 北大核心 2011年第2期87-89,共3页 Water Power
关键词 试验 取水防沙 导沙坎 峡江水电站 experiment water diversion and sediment control silt arrester Xiajiang Hydropower Station
  • 相关文献

参考文献4

  • 1江西省水利规划设计院.峡江水利枢纽可行性研究报告[R].南昌:江西省水利规划设计院.2009.
  • 2]武汉水利电力学院河流泥沙工程学教研室.河流泥沙工程[M].北京:水利出版社,1982.
  • 3江西省水利科学研究院.峡江水力枢纽枢纽水工、泥沙及导流整体模型试验研究报告[R].南昌:江西省水利规划设计院,2010.
  • 4江凌,邹军贤,陆晶,付文军,刘永悦.缅甸DAPEIN(Ⅰ)水电站取水防沙问题研究[J].水电能源科学,2009,27(4):91-93. 被引量:2

二级参考文献5

  • 1李立刚.小浪底工程泥沙淤积的防治对策[J].水电能源科学,2005,23(6):62-65. 被引量:3
  • 2江西省水利规划设计院.DAPEIN(I)水电站可行性研究报告[R].南昌:江西省水利规划设计院,2007.
  • 3武汉水利电力学院河流泥沙工程学教研室.河流泥沙工程[M].北京:水利出版社,1982.
  • 4陆晶,付文军,段兴平.缅甸DAPEIN(I)水电站工程首部枢纽水工、泥沙及导流整体模型试验研究[D].武汉:武汉大学,2008.
  • 5赵若雨,赵直,林岚.辽河下游泥沙治理措施初探[J].东北水利水电,2008,26(12):17-18. 被引量:2

共引文献1

同被引文献30

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部