期刊文献+

浅埋圆形隧道开挖面稳定的可靠度分析

Analysis on Reliability of Excavation Face Stability in Shallow Circular Tunnel
下载PDF
导出
摘要 开挖面支护压力是影响隧道开挖面稳定的重要施工因素,也是进行隧道开挖稳定性可靠度分析的关键。采用FLAC3D软件计算开挖面的最小极限支护压力,结合响应面法计算浅埋圆形隧道开挖面稳定的可靠度指标β,将土体粘聚力和内摩擦角作为随机变量,考虑土体粘聚力和内摩擦角之间的相关性。分析结果表明,不考虑参数相关性计算得到的可靠性指标偏于保守。通过计算验算点处的极限支护压力与原支护压力比较,证明响应面法在结合FLAC3D计算开挖面稳定的可靠度方面是足够准确的。 Support pressure is a significant factor which influences on stability of excavation face in a shallow circular tunnel driven by a pressurized shield, which is also a key point in reliability analysis. FLACaD simulation and response surface methodology is utilized for the reliability index 13 for ultimate state. Both soil shear strength parameters are considered as random variables as the ultimate state studying and also taking into account the statistical correlation between cohesion and internal friction angle. Finally, the assumption of uncorrelated variables was found conservative in comparison to the assumption of negatively correlated variables.
出处 《岩土工程技术》 2011年第1期44-48,共5页 Geotechnical Engineering Technique
基金 上海市重点学科建设资助项目(B308) 上海市规土局资助项目(FDZ2008034)
关键词 盾构隧道 极限支护压力 FLAC3D 开挖面稳定性 可靠度 shield tunnel tunnel collapse pressure FLACaD stability reliability
  • 相关文献

参考文献6

  • 1Borms B B,Bennermark H.Stability of clay at vertical openning[J].Journal of the Soil Mechanics and Foundations Division,1967,93(1):71-94.
  • 2Romo M P,Diaz C M Face stability and ground settlement in shield tunneling[C]//Proceedings of the 10th Int.Conf.on Soil Mechanics and Foundation Engineering,Stockholm:[s.n.],1981,1:357-360.
  • 3黄正荣,朱伟,梁精华,秦建设.浅埋砂土中盾构法隧道开挖面极限支护压力及稳定研究[J].岩土工程学报,2006,28(11):2005-2009. 被引量:79
  • 4Low B K,Tang W H.Reliability analysis of reinforced embankments on soft ground EJ].Canada:Geotechnique.1997,34:672-685.
  • 5Phoon K K,Kulhawy F H.Evaluation of geotechnical property variability[J].Canada:Geotechnique,1999,36:625-639.
  • 6Cherubini C,Giasi I,Rethati L.The coefficient of variation of some geotechnical parameters.Probabi listic methods in geotechnical engineering,K.S.Li and S.C.R.Lo,eds.,Rotterdam:Balkema,1993:179-183.

二级参考文献9

  • 1朱伟,秦建设,卢廷浩.砂土中盾构开挖面变形与破坏数值模拟研究[J].岩土工程学报,2005,27(8):897-902. 被引量:114
  • 2陈俊宏,段绍纬,黄南辉.台北捷运盾构施工引起沉陷探讨[C]∥海峡两岸岩土工程技术交流研讨会城市地下工程与环境保护-台湾卷.2002:273-282
  • 3STALLEBRASS S E,GRANT R J,TAYLOR R N.A Finite element study of ground movements measured in centrifuge model tests of tunnels[C]// Geotechnical Aspects of Underground Construction in Soft Ground.Balkema:Rotterdam,1996.
  • 4DUNCAN J M.State of the art:Limit equilibrium and finite element analysis of slopes[J].Journal of Geotechnical Engineering,ASCE,1996,122(7):577–596.
  • 5PECK R B.Deep excavations and tunnelling in soft ground[C] // Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering.1969:225–290.
  • 6MAIR R J,TAYLOR R N,BRACEGIRDLE A.Subsurface settlement profiles above tunnels in clay[J].Geotechnique,43(2):315–320.
  • 7MAIR R J,TAYLOR R N.Bored tunnelling in the urban environment[C]// Proc 14th ICSMFE.Rotterdam:Balkema,1998:2353–2385.
  • 8孙钧.城市地下工程活动的环境土工学问题(上)[J].地下工程与隧道,1999(3):2-6. 被引量:46
  • 9赵尚毅,郑颖人,时卫民,王敬林.用有限元强度折减法求边坡稳定安全系数[J].岩土工程学报,2002,24(3):343-346. 被引量:1335