摘要
通过对阿尔及利亚东西高速公路的实例分析,介绍了国外项目一般简支梁桥下部结构的计算内容和过程,并给出了简支梁桥下部结构计算公式,对今后国外项目有重要的现实意义。
Through the case analysis of Algeria east-west highway, introduces the calculation content and process of foreign project general sim- ple-supported bridges understructure and gives the calculation formula of simple-supported bridges understructure which has an important practical significance for future foreign project.
出处
《山西建筑》
2011年第9期183-185,共3页
Shanxi Architecture
关键词
简支梁桥
下部结构
荷载
地震
水平力
simple-supported bridges, understructure, load, earthquake, horizontal force