摘要
结合新疆HDBT电站发电引水系统的工程地质条件,介绍了有压隧洞衬砌设计、施工方法,以及上游调压室的优化布置,为类似长发电引水洞的合理、经济设计提供参考。
An introduction was made on the engineering geological conditions of the long power diversion works of HDBT Hydropower Station,based on which the author presented the lining design and construction methods of the pressure tunnel, the arrangement optimization of upstream surge chamber,aiming to provide reference for proper and economical design of similar long power diversion tunnel.
出处
《广西水利水电》
2011年第1期22-24,28,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
隧洞
调压室
衬砌
喷护
设计
优化
Tunnel
surge chamber
lining
sprayed concrete protection
design
optimization