5[1]K.Maile etc. A New Monitoring System for Piping Systems in Fossil Fired Power Plants,Int. J. Pres. Vess. & Piping 66(1996) 305- 317
6[2]S.E.bolt Experimental Determinations of Plastic Collapse Loads for Pipe Elbows,ASME Paper No. 71- PVP- 37
7Huser A, Kvernvold O. Prediction of sand erosion in process and pipe components.Proc 1st North American Conference on Multiphase Technology. Banff, Canada, 1998.217 ~ 227.
8Salama M M. An alternative to API 14E erosional velocity limits for sand laden fluids. OTC 8898, OTC Conference, Houston, 1998. 721 ~733.
9Svedeman S J, Arnold K E. Criteria for sing multiphase flow lines for erosive/corrosive service. SPE 26569, 68th Annual Technical Conference of the Society of Petroleum Engineers, Houston, Texas, 1993.129~ 135.
10McLaury B S, Shirazi S A. Generalisation of AP1 RP 14E for erosive service in muhiphase production. SPE 56812, Proc. SPE Annual Technical Conference, Houston,Texas, 1999.423 ~ 432.