南京长江三桥钢索塔架设平面控制网的建立 被引量:1

Establishment of The Steel-pylon's Erection Horizontal Control Network of Nanjing Third Yangzi River Bridge
下载PDF
导出
摘要 南京长江三桥是我国首座主塔采用钢结构形式的特大型斜拉桥。根据钢索塔拼装测量的精度要求,介绍该桥首级平面控制网的概况,对钢索塔架设专用平面控制网的网形选择、方案设计、观测方法和数据处理进行探讨。实践证明,工程所采取的专用平面控制网布设方法和测量方案是合理的,对类似工程具有借鉴意义。 Nanjing Third Yangzi River Bridge was the first cable-stayed bridge in China,whose main tower was the form steel structure.According to requirement of steel-pylon's assembling survey in precision,the head horizontal control network allgemein of this bridge was introduced,and net form selection,conceptual design,observation technique and data processing of special horizontal control network for steel pylon's erection were researched.The practice has verified that layout method and surveying conceptual of special horizontal control network were reasonable,which could afford some experience to similar projects.
出处 《测绘工程》 CSCD 2011年第1期71-73,80,共4页 Engineering of Surveying and Mapping
关键词 钢索塔 斜拉桥 平面控制网 精度设计 steel pylon cable-stayed bridge horizontal control network accurary design
  • 相关文献

参考文献2

二级参考文献8

  • 1杨太祥.激光铅直投测在施工中的应用.施工技术,1983,(3):21-22.
  • 2中国铁路工程总公司芜湖长江大桥有限责任公司.芜湖长江大桥钢梁制造技术[M].北京:科学出版社,2001..
  • 3本州四国连络桥公团.架桥组曲-多多罗大桥[M].日本:本州四国连络桥公团,1998..
  • 4.道路桥示方书同解说[S].[S].日本:日本道路协会,2002..
  • 5西南交通大学风洞试验室.索塔风洞试验中期报告[R].成都:西南交通大学风洞试验室,2003..
  • 6日本长大株式会社.索塔风洞试验中期报告[R].日本:日本长大株式会社,2003..
  • 7中交公路规划设计院.索塔计算分析报告[R].北京:中交公路规划设计院,2003..
  • 8陈景辉.高层建筑激光—重锤双控轴线引伸技术[J].建筑技术,1997,28(8):556-558. 被引量:1

共引文献29

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部