摘要
重型燃气轮机联合循环电厂往往采用多个控制系统来实现全厂控制,如果采用统一控制平台进行全厂一体化控制,相比多个控制系统具有许多优点。本文以华能金陵燃机电厂控制系统为案例,对重型燃气轮机全厂一体化控制的设计和应用进行了分析和介绍,为联合循环发电厂控制一体化的设计及实现提供了可借鉴的经验。
The Heavy duty gas turbine combined cycle power plant(CCPP) is usually controlled by several control systems in recent years.There are lots of benefits if using one single control system to control the whole power plant.In this paper,two methods are compared.This paper cited Huaneng Jinling CCPP project,which obtained good effect by using integrated control system.This project could be a good reference for future CCPP project design.
出处
《燃气轮机技术》
2011年第1期56-59,共4页
Gas Turbine Technology
关键词
重型燃气轮机
控制系统
一体化设计
heavy-duty gas turbine
control system
integrated design