浅析石油化工建设项目投资控制方法 被引量:3

Brief analysis on means of investment control for petrochemical construction project
下载PDF
导出
摘要 阐述了石油化工建设项目各个阶段常用的控制方法。针对工程项目的不同阶段,分阶段设置控制目标,设计阶段为重点,全过程投资控制;将系统论和控制论的成果用于项目管理,立足于事先的主动的控制决策,用先进的组织管理主动控制和影响项目投资的设计、发包、施工各个阶段。 The control means commonly used in different stages of petrochemical construction projects are expounded.Control targets are set for each stage of projects with the design stage as the main one to perform the overall-process investment control;the achievement of system theory and control theory are used for project management,aforehand active control decision is established in and the advanced organizational management is used to actively control and influence all the stages inclusive of design,giving out contract and construction in project investment.
出处 《炼油与化工》 2011年第1期51-53,64,共3页 Refining And Chemical Industry
关键词 石油化工 建设项目 各个阶段 投资控制 petrochemical construction project every stage investment control
  • 相关文献

参考文献1

  • 1雷仲敏.技术经济分析评价[M].北京:中国标准出版社,2004.

共引文献1

同被引文献8

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部