摘要
针对GE水煤浆气化普遍存在的激冷室至高压闪蒸罐,洗涤塔至高压闪蒸罐等高压管线的堵塞问题,分析原因,提出改进措施。
The black water pipelines are often blocked,which from the quench chamber to the high pressure flash evaporator,and from scrubber to the high pressure evaporator in the GE coal gasification.This paper analyzes the blockage reasons and proposes the improvement measures.
出处
《化工设计通讯》
CAS
2011年第1期28-29,共2页
Chemical Engineering Design Communications
关键词
GE气化
黑水管线
堵塞
措施
GE gasification
black water pipeline
block
measure