期刊文献+

矿山井筒涌水量分段预计初探 被引量:1

Segment Is Expected To Mine Shaft Water Inflow Of
下载PDF
导出
摘要 目前水文地质试验很难做到分层分段抽水,较多的是将含水层划分为若干含水层组进行混合抽水试验,并计算水文地质参数。因此,应用解析法计算井筒穿越各段涌水量存在一些困难。宁夏煤炭勘察工程公司在银星二号煤矿主斜井、副斜井及回风斜井井筒涌水量计算过程中,试探性地采用考虑含水层岩性粒级、含水层厚度及有效水头高度3个因素的加权平均法,计算得到了银星二号煤矿主斜井、副斜井及回风斜井分段涌水量预计值。 The layered hydrogeologieal test is very difficult to sub-pumping, the aquifer is more divided into groups of mixed aquifer pumping test, and calculate the hydro-geological parameters, therefore, application of analytical method to calculate cross sections of the wetlbore discharge, there are some ditlqculties. Ningxia coal exploration and engineering companies in the Silver Star II mine main shaft, Vice Inchned Shaft Shaft and return air discharge calculation process, the tentative use of grain size into account aquifer lithology, aquifer thickness and effective head height of three factor of the weighted average, calculated the Silver Star II mine main shaft, and the return air shaft, vice inclined discharge section predicted.
作者 许月霞 海玮
出处 《神华科技》 2011年第1期40-42,共3页 Shenhua Science and Technology
关键词 井筒涌水量 井筒分段涌水量 含水层岩性粒级 含水层厚度 有效水头值 加权平均值 Wellbore outflow of water, Borehole water inflow section Grain level aquifer lithology Aquifer thickness The effective head value The weighted average.
  • 相关文献

参考文献1

  • 1河北省地质局水文地质四大队.水文地质手册[M]地质出版社,1979.

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部