期刊文献+

并行传送带式摩托车流水线调度模型与求解 被引量:2

Scheduling model of motorcycle parallel conveyor belt flow shop and its solution
下载PDF
导出
摘要 针对一类摩托车制造柔性流水线中的调度问题,提出一种考虑工位差异的并行传送带式流水线调度模型。考虑不同在制品在生产线上不同工位的不同最大加工速度对传送带速度的影响因素,引入射频识别技术实时采集线上在制品的信息,通过及时调整传送带速度提高生产效率;根据生产实际需求,在生产线上不同种类在制品之间插入调整间隔,为更换车型提供准备时间。在此基础上,考虑模型以最小化最大完工时间为目标,采用基于极坐标编码的改进人工鱼群算法进行求解,说明了求解过程中的编码方法、母体迭代方式、人工鱼个体距离等关键技术。通过某摩托车生产企业的实际生产数据验证了该模型的有效性。 Aiming at scheduling problem of a kind of flexible motorcycle assembly lines,a kind of parallel conveyer belt flow shop scheduling model was proposed.Impact of the different max process paces of different Works In Process(WIP) in different stations was considered.Radio Frequency IDentification(RFID) technology was introduced to gather the WIP data in real time.And by adjusting the pace of conveyer belt,production efficiency was improve.According to practical production requirements,intervals were inserted among different kinds of WIPs to provide prepare time for changing models.Then,a kind of improved artificial fish swarm algorithm based on polar coordinate coding was presented.Some key technologies were discussed,including the encoding and coding,iterative pattern of generating body,the distance of artificial fish et al.Finally,this model was testified by the real data from some motorcycle enterprise,and its effectiveness was revealed.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2011年第2期294-300,共7页 Computer Integrated Manufacturing Systems
基金 国家863计划资助项目(2006AA04A124) "211工程"三期建设资助项目(S-09108)~~
关键词 调度模型 并行传送带式流水线 射频识别 人工鱼群算法 极坐标编码 摩托车 scheduling model parallel conveyor belt flow shop radio frequency identification artificial fish swarm algorithm coordinate coding motorcycle
  • 相关文献

参考文献12

二级参考文献104

  • 1刘鹰,王立辉.RFID及RTLS技术和应用[J].应用科技,2004,31(6):51-53. 被引量:9
  • 2李斌,谭立湘,邹谊,庄镇泉.量子概率编码遗传算法及其应用[J].电子与信息学报,2005,27(5):805-810. 被引量:19
  • 3李素粉,朱云龙,尹朝万.具有随机加工时间和机器故障的流水车间调度[J].计算机集成制造系统,2005,11(10):1425-1429. 被引量:13
  • 4戴汝为 周登勇.智能控制与适应性.第三届全球智能控制与自动化大会(WCICA'2000)[M].合肥:-,2000.11-17.
  • 5张曙 杜保光.迈向21世纪的中国机械制造业[J].CIMS,1995,1(3):9-16.
  • 6DAS S R, CANEL C. An algorithm for scheduling batches of parts in a multi cell flexible manufacturing system[J]. International Journal of Production Economics, 2005, 97 (3): 247-262.
  • 7SKORIN-KAPOV J, VAKHARIA A J. Scheduling a flow-line manufacturing cell: a tabu search approaeh[J].International Journal of Production Research, 1993, 31(7):1721-1733.
  • 8SCHALLER J E. A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell[J].International Journal of Production Research, 2000, 38(2):287-308.
  • 9SCHALI.ER J E. A new lower bound for the flow shop group scheduling problem[J]. Computers & Industrial Engineering, 2001, 41(2):151-161.
  • 10FRANCA P M, GUPTA N D, MENDES A S, et al. Evolutionary algorithm for scheduling a flowshop manufacturing cell with sequence dependent family setups[J].Computers & In dustrial Engineering, 2005, 48(3) :491-506.

共引文献1006

同被引文献25

引证文献2

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部