摘要
通过制定周密的计划,在128m3高炉炉顶设备更换的同时,进行炉内喷涂、炉外水循环系统修复、炉顶钢架矫正等项修。实施过程中,可进行立体化交叉作业,提高了工作效率,节省了大修费用。
Through making up careful plan,changing top equipment of 128m3 blast furnace,coating inner wall of blast furnace,repairing external water cyclical system of blast furnace,straightening steel framework of top equipment are done at the same timeThis method can increase working efficiency and can save of cost for heavy repair of blast furnace
出处
《山东冶金》
CAS
1999年第3期26-27,共2页
Shandong Metallurgy
关键词
炉顶设备
喷涂
计划项修
高炉
top equipment of blast furnace,coating ,plan repair