摘要
目前脱硫废水系统设计中存在的种种不合理之处,严重影响脱硫废水的正常投运,通过介绍沁北电厂脱硫废水系统技术改造工程实例介绍脱硫废水技术改造前后的运行效果对比。
Since the desulfuration system is put into operation in Qinbei power plant,because of existing irrationality in the design of desulfuration waste system,proper process on the desulfuration waste water and water quality have been seriously weakened.The introduction is given on technical reformation on the Qinbei power plant desulfuration waste water system and also declares operation effect and water quality report before and after the reformation.
出处
《华中电力》
2011年第1期49-51,55,共4页
Central China Electric Power
关键词
脱硫废水
污泥脱水
系统改造
desulfuration waste water
sludge dehydration
lime milk dosing