摘要
在隧道岩溶区施工时,通过综合运用超前地质预报方法,准确预测围岩的实际情况和溶洞的具体性状,制定有针对性的灾害处治措施,可保证施工正常进行。
During tunnel construction in karst area,through using advance geological forecast method synthetically to forecast the actual condition of wall rock and specific characters of karst cave and institute treatment measures in allusion to hazards,the normal construction can be ensured.
出处
《交通标准化》
2011年第3期216-218,共3页
Communications Standardization
关键词
隧道
岩溶
超前地质预报
灾害处治
tunnel
karst
advance geological forecast
hazard disposal