摘要
结合鄂东长江大桥路面一合同段施工,从原材料控制、冷料仓流量标定、热料仓筛网及操作方面系统的研究了沥青混凝土拌和楼溢料现象,并提出控制技术,避免溢料现象发生。
In the study,combine with the construction of No.1 contract section in the East Hubei Yangtze River Bridge project,from the control of raw material,flow standardization of cold silo,screen of hot silo and operation,research on reasons for the flash overflow problem in blending building of asphalt concrete,and point some solutions and to avoid the problem of flash overflow.
出处
《建材世界》
2011年第1期100-102,106,共4页
The World of Building Materials
关键词
沥青混凝土
拌和站
溢料
asphalt concrete
blending building
flash overflow