高填方碎石地层中人工挖孔桩与冲孔桩的经济技术比较 被引量:3

ECONOMIC AND TECHNICAL COMPARISON BETWEEN MANUAL EXCAVATION BORED PILE AND PUNCHING BORED PILE IN HIGH EMBANKMENT CRUSHED STONE STRATUM
下载PDF
导出
摘要 浙东某大型水厂水池工程中,对高填方碎石地质区域人工挖孔桩和冲击成孔桩进行经济技术分析比较,结果表明在确保施工安全条件下,在高填方碎石土区域,人工挖孔灌注桩的桩身质量、工程造价、施工工期等均优于冲击成孔桩。 In the water pond engineering of a large water plant in East Zhejiang, economic and technical analysis and comparison are made between manual excavating pile and punching pile in high embankment crushed stones geological area, and the comparison results indicate that the quality of pile body, construction cost, construction schedule of manual excavating pile are better than those of punching pile in the high embankment crushed stone geological area under precondition of guaranteeing safe construction.
作者 袁受权
出处 《建筑技术》 北大核心 2011年第3期233-234,共2页 Architecture Technology
关键词 高填方碎石地质 人工挖孔灌注桩 冲击成孔桩 high embankment crushed stone geology manual excavation bored pile punching bored file
  • 相关文献

参考文献1

  • 1建筑施工手册[M].北京:中国建筑工业出版社,2003.(4).

共引文献29

同被引文献16

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部