2Ng W C,Mak K L. Yard crane scheduling in port container terminals [J]. Applied Mathematical Modelling, 2005 (29) : 263-275.
3Ng W C. Mak K L,Tsang W S. Scheduling yard crane in a port container terminal using genetic algorithm [j]. International Journalof Industrial Engineering, 2006,13: 246-253.
4Kim K H. Lee K M, Hwang H. Sequencing delivery and receiving operations for yard cranes in port container terminals [J].International Journal of Production Economics,2003,84 (3) : 283—292.
5Ng W C. Crane scheduling in container yards with inter—crane interference[J].European Journal of Operational Research.2005.164(1):64-78.
6Li W, Wu Y,Petering M E H, et al. Discrete time model and algorithms for container yard crane scheduling [j]. European Journalof Operational Research,2009,198(1) : 165-172.
7Mak K L,Sun D. A new hybrid genetic algorithm and tabu search method for yard cranes scheduling with inter-crane interference [C]//Proceedings of the World Congress on Engineering. London, U.K.: WCE, 2009.
8Javanshir H,Seyedalizadeh Ganji S R. Yard crane scheduling in port container terminals using genetic algorithm Q]. Journal ofIndustrial Engineering International,2010,6(11):39-50.